Brick Veneer Bowing Cambridge ON

On a 20-story brick-veneer building in Cambridge, the masonry is bulging and cracking at each relieving angle. The building has no horizontal expansion joints. Could the cracking result from brick expansion? What can be done?

Brantco Construction
519-622-1600
1555 Bishop Street North
Cambridge, ON
Hinz Paving Excavating & Gravel
519-653-2184
145 Speedsville Road
Cambridge, ON
C-T Paving Ltd
519-746-6914
Po Box 95
Waterloo, ON
Done-Rite Paving Company
905-357-6531
5232 Montrose Road
Niagara Falls, ON
Tri Son Contracting Inc
905 985-4179
116 NorthPort
Lindsay, ON
Wayco Cleaning & Landscaping Inc
519-740-2032
100 Sheldon Drive
Cambridge, ON
K-W Cornerstone Paving Ltd
519-740-9732
RR 4 Stn Galt
Cambridge, ON
Quality Paving 1994 Limited
519-743-8338
1830 Glasgow
Kitchener, ON
Rosedale Paving
705 454-8414
RR 1 FenelonFalls Coboconk
Lindsay, ON
Armstrong Paving Ltd
519-754-0500
71 Emilie Street
Brantford, ON
Provided By:

Brick Veneer Bowing

Source: MASONRY CONSTRUCTION MAGAZINE
Publication date: July 1, 1993

On a 20-story brick-veneer building, the masonry is bulging and cracking at each relieving angle. The building has no horizontal expansion joints. Could the cracking result from brick expansion? What can be done?

This is fairly common in masonry veneer high-rise buildings where relieving angles are used without horizontal expansion joints. During construction, a small gap generally is left between the bottom of each relieving angle and the top of the brick below. As the masonry grows due to moisture and thermal expansion, the gap between the masonry and the shelf angle narrows. Mortar placed at the tip of the angle creates a solid bridge between the masonry above and below the relieving angle. This portion of the joint cannot compress. Resulting forces often cause bowing and spalling.Also look at tie placement. If the nearest ties are more than 12 inches above and below the relieving angle, bowing is more likely.Corrosion of the shelf angle also can cause bowing. Steelcorrosion products are larger than steel itself. This creates pressures that act on the wall similarly to moisture and thermal expansion.These problems are compounded if the building's frame shrinks over time as the masonry expands.Bowing and spalling can be prevented by leaving adequate space beneath each angle during construction. The size of these spaces depends on expected movement. Procedures for sizing joints are given in BIA Tec...

Click here to read full article from Masonry Construction