Brick Veneer Bowing Caledon ON

On a 20-story brick-veneer building in Caledon, the masonry is bulging and cracking at each relieving angle. The building has no horizontal expansion joints. Could the cracking result from brick expansion? What can be done?

DiGregorio International Paving & Construction Ltd
905-951-1616
4 Holland Drive
Bolton, ON
Dominion Paving Co
905-356-1922
4615 Buttrey Street
Niagara Falls, ON
C & R Paving Inc
905-427-6282
1976 Notion Road
Pickering, ON
Crown Paving Ltd
905 337-7283
PO Box 211
Georgetown, ON
Quality Paving 1994 Limited
519-743-8338
1830 Glasgow
Kitchener, ON
Essential Landscaping
905-857-5296
1 Marconi Court
Bolton, ON
Miller Paving Ltd
705-267-1107
3285 Hwy 655
Timmins, ON
Cox Construction Limited
519-824-6570
687 Eramosa Road
Guelph, ON
Canadian Driveway Sealing
705-324-5050
46 Queen Street
Lindsay, ON
Heritage Paving Inc
705-268-3040
339 Cameron Street South
Timmins, ON
Provided By:

Brick Veneer Bowing

Source: MASONRY CONSTRUCTION MAGAZINE
Publication date: July 1, 1993

On a 20-story brick-veneer building, the masonry is bulging and cracking at each relieving angle. The building has no horizontal expansion joints. Could the cracking result from brick expansion? What can be done?

This is fairly common in masonry veneer high-rise buildings where relieving angles are used without horizontal expansion joints. During construction, a small gap generally is left between the bottom of each relieving angle and the top of the brick below. As the masonry grows due to moisture and thermal expansion, the gap between the masonry and the shelf angle narrows. Mortar placed at the tip of the angle creates a solid bridge between the masonry above and below the relieving angle. This portion of the joint cannot compress. Resulting forces often cause bowing and spalling.Also look at tie placement. If the nearest ties are more than 12 inches above and below the relieving angle, bowing is more likely.Corrosion of the shelf angle also can cause bowing. Steelcorrosion products are larger than steel itself. This creates pressures that act on the wall similarly to moisture and thermal expansion.These problems are compounded if the building's frame shrinks over time as the masonry expands.Bowing and spalling can be prevented by leaving adequate space beneath each angle during construction. The size of these spaces depends on expected movement. Procedures for sizing joints are given in BIA Tec...